Production comes first
How an installation's load sits alongside your lines, and what happens when production needs the headroom, is assessed with your electrician and confirmed in your agreement.
For building owners Factory
A works is sanctioned for every motor, compressor and furnace at once, and draws that hard only on a full shift with everything running. One locked room on that margin may support an installation. An assessment and your agreement determine suitability, responsibilities and payment.
For factories
Factories already have what most buildings lack: three-phase everywhere, a panel with spare ways, and an electrician who knows where the load goes. What they usually also have is a sanctioned load set for the day every line runs at once, a second and third shift that never draw it, and a store room off the shop floor that has been locked for years. The fixed charges cover the whole figure regardless.
A store room off the shop floor, the old quality lab or tool-room annex, a room in the office block that shares a wall with the panel room, or a plant-room annex. Factories rarely lack a room; they lack a room that locks, has cooling of its own and is kept clear of the process, and the assessment looks for that.
Sanctioned for every motor, compressor, furnace and line running at once, and drawn that hard on a full shift with everything up. A works on one shift leaves the second and third spare; a works on three shifts leaves less, and the assessment says so plainly. The spare is the sanctioned figure on your bill minus your twelve-month peak, and a plant electrician usually knows it to the kilowatt.
The assessment confirms the supply, tie-in and cooling an installation needs, and what your room can support.
Eligibility
What decides whether a room in a factory can be assessed for an installation, and what the assessment then checks on site.
A works on one shift leaves more margin than a works on three. The spare is your sanctioned load minus that peak.
An installation needs a room around it: a door that shuts, cooling of its own and the process kept outside.
The assessment looks for headroom for the tie-in an installation needs and a practical cable run.
The general guide to the initial requirements is on the owners page.
Operating considerations
How an installation's load sits alongside your lines, and what happens when production needs the headroom, is assessed with your electrician and confirmed in your agreement.
The shop floor cannot reject an installation's heat or keep dust out. The room needs cooling of its own and a door that stays shut.
Your own electrician can review the proposed tie-in, and visits are planned around shift changes.
Responsibilities
What Azita does, and what is confirmed in your agreement.
| Responsibility | Azita | Building owner or customer | Confirmed in your agreement |
|---|---|---|---|
| Design | Azita | ||
| Installation | Azita | ||
| Commissioning | Azita | ||
| Operation | Azita | ||
| Metering | Azita | ||
| Funding | Confirmed in your agreement | ||
| Equipment ownership | Confirmed in your agreement | ||
| Room preparation | Confirmed in your agreement | ||
| Power | Confirmed in your agreement | ||
| Cooling | Confirmed in your agreement | ||
| Connectivity | Confirmed in your agreement | ||
| Access | Confirmed in your agreement | ||
| Maintenance | Confirmed in your agreement | ||
| Removal | Confirmed in your agreement |
Azita designs, installs, commissions, operates and meters. Everything else varies by arrangement and is confirmed in your agreement, including what a building owner or customer provides.
Hosting model
The same illustration as on the owners page, opened at typical inputs for a factory. Its assumptions sit beside the result; the assessment and your agreement establish the actual terms.
Indicative pods from your room and power inputs
1
1 × 10 kW pods, 14.4 kW at the meter of your 45 kW
Counted from your room count and available power only. Room size and cooling are context for the assessment; they do not confirm that equipment fits.
Illustrative model, not a site-specific offer or measured earnings. It applies to hosting for others; an installation for your own work needs its own proposal.
It uses spare sanctioned load on a separate tie-in. How it gives way if your lines need the headroom is assessed with your electrician and confirmed in your agreement.
The shop floor itself is not the place for it. It needs a room around it: a door that shuts, cooling of its own and dust kept outside. That is what the assessment checks.
Yes, and we encourage it. Mention your electrician in the enquiry so the assessment can include them.
Sometimes less than you expect. The spare is your sanctioned load minus your twelve-month peak; if the gap is too small for an installation, the assessment says so and tells you what would change it.
Property assessment
The form starts with “Factory” as the building type, and you can change it. A location and a short description are enough to start.
Share a few details. We’ll help assess the space and explain what an installation would involve.