Guests first
Service visits go through back of house with your chief engineer, away from guest floors and events.
For building owners Hotel
A hotel's load is set by the night the banquet hall, every room and the kitchens all run at once, and it is drawn that hard a few weeks a year. A back-of-house room on that margin may support an installation. An assessment and your agreement determine suitability, responsibilities and payment.
For hotels
The sanctioned figure covers a full house, a wedding in the hall and both kitchens at once. Through the monsoon the banquet hall is dark, occupancy falls and the chillers idle back, but the fixed charges for the whole figure arrive every month. Hotels also have the one thing most hosts lack: cooling that already runs around the clock.
A plant-room annex, a store on the service level beside the laundry or the engineering office, the old business centre that guests stopped using, or a room that held equipment the hotel replaced. Hotels have cooling that runs around the clock, which is the hardest thing for most hosts to provide, so the assessment mainly looks for a door that locks away from any guest floor.
Sanctioned for full occupancy, a banquet in the hall and both kitchens together, and drawn that hard a few weeks a year. The monsoon and the weekday trough in a leisure property leave a wide margin; a business hotel's margin is at weekends. The spare is the sanctioned figure on your bill minus your twelve-month peak, and the assessment reads the bills with your chief engineer.
The assessment confirms the supply, tie-in and cooling an installation needs, and what your room can support.
Eligibility
What decides whether a room in a hotel can be assessed for an installation, and what the assessment then checks on site.
A plant-room annex or a store on the service level is the usual starting point.
On a management contract, both may need to consent, and the assessment sets out whose signature is needed.
Twelve months of bills read against the events calendar show the margin.
The general guide to the initial requirements is on the owners page.
Operating considerations
Service visits go through back of house with your chief engineer, away from guest floors and events.
Hotels usually have cooling around the clock. The assessment checks that the room's own unit or the chilled-water loop can take the heat of an installation.
How an installation relates to your DG in an outage is assessed with your chief engineer and confirmed in your agreement.
Responsibilities
What Azita does, and what is confirmed in your agreement.
| Responsibility | Azita | Building owner or customer | Confirmed in your agreement |
|---|---|---|---|
| Design | Azita | ||
| Installation | Azita | ||
| Commissioning | Azita | ||
| Operation | Azita | ||
| Metering | Azita | ||
| Funding | Confirmed in your agreement | ||
| Equipment ownership | Confirmed in your agreement | ||
| Room preparation | Confirmed in your agreement | ||
| Power | Confirmed in your agreement | ||
| Cooling | Confirmed in your agreement | ||
| Connectivity | Confirmed in your agreement | ||
| Access | Confirmed in your agreement | ||
| Maintenance | Confirmed in your agreement | ||
| Removal | Confirmed in your agreement |
Azita designs, installs, commissions, operates and meters. Everything else varies by arrangement and is confirmed in your agreement, including what a building owner or customer provides.
Hosting model
The same illustration as on the owners page, opened at typical inputs for a hotel. Its assumptions sit beside the result; the assessment and your agreement establish the actual terms.
Indicative pods from your room and power inputs
2
2 × 10 kW pods, 28.8 kW at the meter of your 60 kW
Counted from your room count and available power only. Room size and cooling are context for the assessment; they do not confirm that equipment fits.
Illustrative model, not a site-specific offer or measured earnings. It applies to hosting for others; an installation for your own work needs its own proposal.
It sits in a locked back-of-house room away from guest floors and gives its heat to the room's cooling. Whether the sound at the door is acceptable is checked in the room before anything is signed.
How an installation relates to your DG is assessed with your chief engineer and confirmed in your agreement.
The owner of the building and the connection, with the operator's consent where the operator holds the room. The assessment tells you whose signatures the agreement needs.
Tell your insurer early. Insurance arrangements for the installation are confirmed in your agreement.
Property assessment
The form starts with “Hotel” as the building type, and you can change it. A location and a short description are enough to start.
Share a few details. We’ll help assess the space and explain what an installation would involve.