Backup power and critical load
How an installation relates to your DG, UPS and changeover scheme is assessed on the single-line diagram and confirmed in your agreement.
For building owners Hospital campus
A campus is sanctioned for the worst day and runs around the clock, which leaves a narrower margin than an office and a far better cooling plant. A locked room off the services block may support an installation. An assessment and your agreement determine suitability, responsibilities and payment.
For hospital campuses
Imaging, theatres, the chiller plant, sterilisation, a DG farm to carry all of it: the connection was sized for the day every one of those peaks together, and the fixed charges cover that figure every month. Most days the draw is well under it. What a hospital will not do, rightly, is put its DG, its UPS or its clinical load at risk, so the assessment starts from them.
A locked room off the plant or services block, the old medical records store that digitisation emptied, a room reserved for imaging that was never installed, or a bay in the engineering yard. The room has to be outside the clinical buildings and on the campus connection, and the assessment starts from which side of the panel your DG and UPS carry.
Sanctioned for imaging, theatres, sterilisation and the chiller plant peaking together, and drawn around the clock at a level well under that on an ordinary day. The margin is narrower than an office's and the assessment says so; a teaching campus adds a vacation trough from the hostels. What a hospital has that few hosts do is a plant that already rejects heat around the clock, and an engineering team that knows its load to the kilowatt.
The assessment confirms the supply, tie-in and cooling an installation needs, and what your room can support.
Eligibility
What decides whether a room on a hospital campus can be assessed for an installation, and what the assessment then checks on site.
The starting point is a room off the services or plant block, away from wards and theatres.
It shows which side of the panel your DG and UPS carry, and the assessment reads it before anything else.
Your own permits and access rules shape the schedule, so they are part of the assessment from the start.
The general guide to the initial requirements is on the owners page.
Operating considerations
How an installation relates to your DG, UPS and changeover scheme is assessed on the single-line diagram and confirmed in your agreement.
Tell us how your clinical network and patient systems are arranged, so the assessment can scope the installation's connectivity around them. What connects to what is confirmed in your agreement.
Visits follow your engineering team's permits and routes, away from patient areas, and access arrangements are confirmed in your agreement.
Responsibilities
What Azita does, and what is confirmed in your agreement.
| Responsibility | Azita | Building owner or customer | Confirmed in your agreement |
|---|---|---|---|
| Design | Azita | ||
| Installation | Azita | ||
| Commissioning | Azita | ||
| Operation | Azita | ||
| Metering | Azita | ||
| Funding | Confirmed in your agreement | ||
| Equipment ownership | Confirmed in your agreement | ||
| Room preparation | Confirmed in your agreement | ||
| Power | Confirmed in your agreement | ||
| Cooling | Confirmed in your agreement | ||
| Connectivity | Confirmed in your agreement | ||
| Access | Confirmed in your agreement | ||
| Maintenance | Confirmed in your agreement | ||
| Removal | Confirmed in your agreement |
Azita designs, installs, commissions, operates and meters. Everything else varies by arrangement and is confirmed in your agreement, including what a building owner or customer provides.
Hosting model
The same illustration as on the owners page, opened at typical inputs for a hospital campus. Its assumptions sit beside the result; the assessment and your agreement establish the actual terms.
Indicative pods from your room and power inputs
1
1 × 10 kW pods, 14.4 kW at the meter of your 30 kW
Counted from your room count and available power only. Room size and cooling are context for the assessment; they do not confirm that equipment fits.
Illustrative model, not a site-specific offer or measured earnings. It applies to hosting for others; an installation for your own work needs its own proposal.
That is the first thing the assessment looks at. How the installation relates to your backup power is assessed on your single-line diagram and confirmed in your agreement.
Hosting for others is not a clinical service, and the assessment scopes the installation's connectivity around your clinical network. What connects to what is confirmed in your agreement.
Yes, as a separate route. An installation for your own AI work is a different agreement from hosting for others. The healthcare page describes that workload, and the form keeps the route you choose.
The healthcare pageAzita designs, installs and commissions the installation, and your own electrical consultant is welcome to review the drawings. The inspections and approvals the site needs are established in the assessment.
Property assessment
The form starts with “Hospital campus” as the building type, and you can change it. A location and a short description are enough to start.
Share a few details. We’ll help assess the space and explain what an installation would involve.